鋼筋加工棚的8點(diǎn)安裝事項(xiàng)
來源:http://hbxcsyj.com/ 發(fā)布時(shí)間:2023-02-17
鋼筋加工棚是施工現(xiàn)場(chǎng)鋼筋調(diào)直、彎曲和焊接的場(chǎng)所。鋼筋加工棚我們來看看是怎么裝的。
The reinforcement processing shed is the place for reinforcement straightening, bending and welding at the construction site. Let's see how to install the reinforcement processing shed.
1、埋設(shè)預(yù)埋件(預(yù)埋件包含在單柱鋼棚內(nèi),雙柱安裝使用膨脹螺絲)
1. Embedded parts (embedded parts are included in single-column steel shed, and expansion screws are used for double-column installation)
2、將主梁與立柱連接器對(duì)接,(不要擰14個(gè)螺絲),鋼筋加工棚先將斜撐安裝在上斜撐上(用14個(gè)螺絲)。否則,支架的孔沒有對(duì)齊。
2. Connect the main beam with the column connector (do not tighten 14 screws), and install the diagonal brace on the upper diagonal brace (use 14 screws) in the reinforcement processing shed. Otherwise, the holes of the bracket are not aligned.
3、安裝主梁(單柱主梁為140工字鋼和50方管焊接框架,雙柱主梁為50方管焊接框架)與柱之間的連接件(14個(gè)螺釘)。
3. Install the connections (14 screws) between the main beam (140 I-beam and 50 square tube welded frame for single-column main beam, and 50 square tube welded frame for double-column main beam) and the column.
4、用叉車或吊車將立柱吊起安裝,間距3米(單柱單柱為200工字鋼,雙柱為100方管)。鋼筋加工棚安裝時(shí),確保立柱的腰線在中間3米。方管柱底盤通過20*180膨脹螺栓與預(yù)埋件連接,H型鋼柱。
4. Use a forklift or crane to lift and install the columns with a spacing of 3 meters (single column and single column are 200 I-beams, and double columns are 100 square tubes). When installing the reinforcement processing shed, ensure that the waist line of the column is 3 meters in the middle. The square pipe column chassis is connected with the embedded parts through 20 * 180 expansion bolts, and H-shaped steel column.
5、安裝側(cè)梁(50方管焊接框架),兩邊用10×12螺釘,中間用10×18螺釘。
5. Install the side member (50 square tube welded frame) with 10 on both sides × 12 screw, 10 in the middle × 18 Screw.
6、安裝檁條,底層6個(gè)2.99米鉆尾,鋼筋加工棚4個(gè)2.94米夾角鐵,裝上。
6. Install purlins, six 2.99m drilled tails at the bottom, and four 2.94m angle iron clips at the top of the reinforcement processing shed, and install them.
7、設(shè)置彩鋼屋面,彩鋼板尺寸為1.14*3.0米,中間每隔3米,在柱的左右兩側(cè)放置三塊彩鋼板,鋼筋加工棚彩鋼板通過鉆尾絲與下檁條連接。
7. The color steel roof is set. The size of the color steel plate is 1.14 * 3.0m, and three color steel plates are placed on the left and right sides of the column every 3m in the middle. The color steel plate of the reinforcement processing shed is connected with the lower purlin through the drilling tail wire.
8、四面安裝廣告布,用鉆尾絲打邊梁和主梁。
8. Install advertising cloth on all sides, and punch the side beam and main beam with drilling thread.
鋼筋加工棚的施工規(guī)范是日常建筑施工中必不可少的。這種規(guī)范可以給我們帶來放心,保證建筑的牢固性。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://hbxcsyj.com咨詢!
The construction specification of reinforcement processing shed is indispensable in daily construction. This kind of specification can give us reassurance and ensure the firmness of the building. Come to our website for more relevant content http://hbxcsyj.com consulting service